The Planner Director decision has been appealed. 3 parcel M49 Partition E130513- EAGER in the EFU zone.
Planning and Zoning
Planning and Zoning
Hearings Officer: Z0172-24 - Sept. 5, 2024
Conditional use permit to operate a biomedical waste transfer station in a portion of an existing building. The proposed transfer station will operate within the existing building; no new construction is proposed.
Hearings Officer: Z0220-24 - Sept. 5, 2024
Construct a 12-acre photovoltaic solar power generation facility.
Historic Review Board - Aug. 1, 2024
Z0263-24: New Construction of a single family home authorized by a Measure 49 Claim on the Ralph H, Sawtell Farm historic landmark
Hearings Officer: Z0033-24 - July 25, 2024
This hearing is for the appeal of a decision made by the County Planning and Zoning Division.
The applicant requested approval of a temporary forest labor camp to remove debris and slash from previous timber operation, harvest forest products such as mushrooms, and replant
The applicant requested approval of a temporary forest labor camp to remove debris and slash from previous timber operation, harvest forest products such as mushrooms, and replant
Hearings Officer: Z0339-23 - July 18, 2024
Appeal of Planning Directors Decision of a Nonconforming Use Verification and Alteration for Pat’s Acres
Racing Complex.
Hearings Officer: Z0161-24 - July 25, 2024
The applicant proposes to construct a municipal water storage reservoir. The reservoir will be a green, bolted steel tank, with an aluminum dome top. They are seeking review of two possible sizes: A 500,000-gallon reservoir would be approximately 61-feet in diameter and 28 feet tall; alternatively, a 1,000,000-gallon reservoir would be approximately 81-feet in diameter and 30 feet tall. Whichever size reservoir is selected, the tank will be located in the northwest corner of the property abutting along SE Lucky Ln.
Land Use Hearing: ZDO-288 Utility Facilities - June 12, 2024
Ordinance ZDO-288, Utility Facilities, is a package of text amendments to the Clackamas
County Comprehensive Plan (Plan) and Zoning and Development Ordinance (ZDO). It is intended to
more comprehensively define “utility facility” and related terms and to allow a broader range of utility
facilities to qualify as primary or accessory uses rather than conditional uses. The significance of this is
that utility facilities that are primary or accessory uses would not require a land use application in most
cases; the exception would be where the facility is subject to certain environmental or hazard regulations,
such as floodplain or stream buffer requirements.