WES is investing in our infrastructure to provide resilient, reliable sanitary sewer service to protect the environment and serve your community. We will be upgrading electrical equipment, automatic controls, on site power generation and pumps at the facilities below. The pump stations are a vital part of our infrastructure that needs to be operational 24 hours a day 365 days a year pumping sanitary sewage safely on through the collection system to our water resource recovery facilities for treatment.
Pump station upgrades and repairs estimated construction dates (7/23)
Name | Location | Estimated construction timeframe |
---|---|---|
Bolton | 6597 N. E. Failing Street, West Linn | Completed Summer 2023 |
River Street | 5770 River Street, West Linn | Completed Fall 2023 |
Timberline Rim | 64401 E Brightwood Loop Road, Brightwood | Completed Summer 2023 |
Clackamas | 16561 Southeast Evelynn Street, Clackamas County | Fall 2023 through Spring 2024 |
Gladstone | 391 West Clackamas Boulevard, Gladstone | Fall 2023 through Winter 2024 |
Mitchell Creek | 8900 SE 155th Ave Happy Valley | Summer 2024 through Fall 2024 |
Carver | 15860 OR-224 Damascus | Summer 2024 through Fall 2024 |
Sieben Lane | 14149 SE 142nd Avenue, Clackamas County | Summer 2025 |
82nd Drive | I205 off ramp and 82nd drive, Gladstone | Summer 2025 |
Golf Club Terrace | East Highland Drive, Welches | Summer 2025 |
South Welches | Mt. Hood Resort golf course, Welches | Summer 2025 |