Industrial Pretreatment Discharge Permit Annual Fee | |
---|---|
a. 5–8 Industrial User Points | $1,500 per year |
b. 9–3 Industrial User Points | $2,250 per year |
c. 14–17 Industrial User Points | $3,000 per year |
Septage Hauling | |
Septage Permit Fee | $150 3 year term |
Septic Tank Waste Discharge | $0.12/gallon |
Extra Strength | |
Rate Zone 1 | Biochemical Oxygen Demand (BOD) $0.1675/lb. Suspended Solids (SS) $0.145/lb.7 |
Rate Zone 2 | Biochemical Oxygen Demand (BOD) $0.2421/lb. Suspended Solids (SS) $0.1490/lb. |