Design phase
Updated: June 25, 2024
Increasing stormwater capacity to reduce flooding and improve fish habitat and waterway access
Kellogg Creek flows through an undersized culvert causing the creek to back up at SE Thiessen Road and flood the road and properties upstream. We will replace the culvert with a larger culvert to allow water to move naturally for lower stream flows in the summer and higher stream flows from large storm events in the winter. Vegetation will be planted at both ends of the culvert to restore stream habitat.
Why
To decrease the frequency of flooding on the roadway and water backed up on adjacent properties upstream, and improve the habitat and ability for fish to pass through the culvert carrying Kellogg Creek.
Schedule
- Design: April 2023 to Dec. 2024
- Right of way: April 2024 to Winter 2024/2025
- Construction: Spring 2025 to Winter 2025/2026
Traffic impact
- Expect shoulder and lane closures and detours with delays up to 20 minutes during construction.
Current activities
- Project planning and solicitation of design services.
Funding
- Project estimate $1.5 million paid for with American Rescue Plan Act (ARPA) funds.