Knights Bridge Road/Arndt Road intersection safety improvements

Status

Design

Updated: March 27, 2024

Reducing rear-end crashes by improving visibility of intersection

Most crashes at this intersection are rear-end collisions. Includes installing a radar detection system to detect vehicles as they approach the Knights Bridge Road/Arndt Road intersection. The detection prevents the signal from changing to another direction prematurely and placing drivers in a dilemma of deciding to go through the intersection or not, causing longer wait times. Also adding signal ahead signs and pavement markings to alert drivers of changing conditions. 

Why

To provide a safer roadway for all users by increasing visibility of intersection.

Schedule

  • Design: Dec. 2023 to June 2024
  • Construction: Sept. 2024 to June 2025

Traffic impact

Traffic impacts will be minor during installation.

Current activities

Project planning. 

Funding

  • Project estimate $325,000.
  • Funding is provided from HB2017 state gas taxes.

Phone:503-742-4691
Email:engineering@clackamas.us

150 Beavercreek Road Room #325 Oregon City, OR 97045

Office Hours:

Monday to Thursday
8 a.m. to 4 p.m.

Available by phone/email
Friday
8 a.m. to 3 p.m.