Canby-Marquam Hwy Safety Improvements

Status

Project is in design phase.

Updated: Dec. 12, 2023

Many crashes occur on a windy segment of Canby-Marquam Hwy near Kraxberger Road (approximately between MP 5.05 and MP 5.45) due to drivers leaving the roadway, especially in wet conditions. Safety improvements include repaving to improve pavement friction, two radar-activated curve warning signs with lights, and enhanced safety signing.

 

Why

To increase safety and reduce lane departure crashes.

Schedule

  • Design: Jan 2024 - Dec. 2024
  • Construction: winter 2025/2026 - summer 2025

Traffic impact

  • Intermittent lane closures will be needed during construction.

Current activities

  • Project design

Funding

  • Project estimate $470,000
  • Funding is provided from HB 2017 state gas tax safety funds
Contact
Department Staff
Christian Snuffin
503-742-4716

Phone:503-742-4691
Email:engineering@clackamas.us

150 Beavercreek Road Room #325 Oregon City, OR 97045

Office Hours:

Monday to Thursday
8 a.m. to 4 p.m.

Available by phone/email
Friday
8 a.m. to 3 p.m.

Related Events
Transportation Engineering
-
Transportation Engineering
-