General Inspections |
Inspections outside normal business hours |
$85/hr + OT (min 4-hr charge) |
Re-inspection fees |
$85 |
Inspections with no specific fee listed (min. ½ hour) |
$85/hr |
Additional plan review required by change, additions or revisions to approved plans |
$85/hr (min 1-hr charge) |
Residential Certificate of Occupancy (charged when permit is issued) |
$42.50 |
Temporary Certificate of Occupancy (commercial) |
$85/hr (min. 2-hr charge) |
Certificate of Occupancy (commercial) |
$85/hr (min. 2-hr charge) |
1- and 2-family mechanical min. permit fee and re-inspection fee |
$85 |
For each supplemental permit |
$21 |
Heating, Ventilating and Air Conditioning (HVAC) |
Air conditioner |
$18 |
Alteration of existing HVAC system |
$18 |
Fire/smoke dampers/duct smoke detectors |
$12 |
Heat pump |
$18 |
Install/replace/relocate heaters - suspended, wall or floor-mounted |
$18 |
Vent for appliance other than furnace |
$12 |
Environmental exhaust and ventilation |
Appliance vent |
$12 |
Exhaust fan with single duct (bath fans) |
$9 |
Dryer exhaust |
$9 |
Hoods: Type l/ll residential kitchen/hazmat hood fire suppression systems |
$12 |
Exhaust system apart from heating and AC |
$9 |
Fuel piping and distribution (up to 4 outlets) |
$5 |
Fuel piping (more than 4 outlets, each additional) |
$2 |
Fireplaces/Stoves |
Decorative fireplace |
$18 |
Insert-type |
$18 |
Woodstove/pellet stove |
$18 |
HVAC Air Handling Unit |
0–10K CFM |
$12 |
Over 10K CFM |
$23 |
Boiler/Compressor |
to 3HP/100K BTU |
$18 |
to 15hp/500k BTU |
$33 |
to 30HP/1.00m BTU |
$44 |
to 50HP/1.75m BTU |
$68 |
Over 50HP/1.75 BTU |
$109 |
Furnace |
Up to 100K BTU |
$18 |
Over 100K BTU |
$23 |
Refrigeration |
Absorption unit to 100k BTU |
$18 |
Over 100k BTU |
$23 |
Chillers/Compressors |
Up to 3HP/100K BTU |
$18 |
to 15HP/500K BTU |
$33 |
to 30HP/1.00m BTU |
$44 |
to 50HP/1.75m BTU |
$68 |
Over 50HP/1.75 BTU |
$109 |
Fuel Piping |
0–4 outlets |
$5 |
Each additional (4 or more outlets requires a schematic) |
$2 |
Process Piping |
0–4 outlets |
$5 |
Each additional |
$2 |
Residential plan review (when applicable) |
25% of permit fee |
Other |
Water heater |
$9 |
Cook top |
$12 |
Gas logs |
$12 |
LPG tanks/regulators |
$12 |
Mechanical Commercial
($85 min. + fee based on valuation as listed below. Note fees are based on valuation minimum) |
$1–$5,000 |
$85 |
$5,001–$10,000 |
$85 + $1.66 for each $100 of value over $5,000 |
$10,001–$100,000 |
$168 + $12.34for each $1,000 of value over $10,000 |
$100,000 + |
$1,279 + $8.47for each $1,000 of value over $100,000 |
Commercial plan review |
25% of base HVAC fee |
Manufactured Dwellings, Park Trailers, Cabanas |
Site installation/set up fee for manufactured dwelling, park trailer or cabana |
$407 |
Earthquake-resistant bracing system installation (in addition to site described above) |
$103 installation fee |
Re-inspection (fee must be paid prior to next inspection) |
$85/inspection |
Installation w/o permits |
Actual cost of investigation |
Inspections outside normal business hours |
$85/hr (min. 4 hrs OT rate) |
OR Mfg. Dwelling Standard publication (required when no installer is involved) |
$12 |
Mobile home park construction and recreational park development |
Varies w/ number of spaces |
Electrical
includes a prescribed number of inspections; see electrical permit application for quantities |
Electrical plan review required for new construction and alterations in the following locations per OAR 918-311-0040:
- Service or feeder beginning at 400 amps with available fault current greater than 10,000 amps at 150 volts or less to ground, or any system greater than 14,000 volts
- Installation of 150 KVA or larger separately derived system per Article 100 of the NEC
- Addition of a new motor load greater than 100 HP
- Fire pump installations as defined in Article 695 of the NEC
- Emergency systems installations as defined in Article 700 of the NEC
- Six or more residential units in one structure or any A, E, 1-2 or
1-3 occupancies as defined in the Oregon Structural Specialty Code 25% of permit fee
- Service or feeder rated at 60 amps or over
- System over 600 supply volts nominal
- Building more than 3 stories in height
- Building over 10,000 sq. ft.
- Occupant load over 99 persons
- Manufactured structures park or recreational vehicle park; new addition or alterations
- Classified area or structure containing special occupancy as described in NEC Chapter 5
|
Residential single- or multi-family dwelling units including attached garages and covered areas not more than 1,000 sq. ft. |
$270 |
Each additional 500 sq. ft. |
$55 |
Limited energy: up to 2 inspections only |
$109 |
Limited energy, residential |
$109 |
Limited energy, multi-family |
$109 |
Manufactured home service or feeder |
$109 |
Temp. Const. Service, Feeder |
Less than 200 amps |
$94 |
201–400 amps |
$200 |
401–600 amps |
$270 |
601–1000 amps |
$482 |
Over 1000 amps |
$882 |
Permanent Service, Feeder |
Less than 200 amps |
$161 |
201–400 amps |
$213 |
401–600 amps |
$321 |
601–1000 amps |
$482 |
>1000 amps |
$882 |
Service reconnect only |
$109 |
Branch Circuits
new, alteration, extension per panel |
With purchase service or feeder |
$12 |
Without purchase service or feeder: |
|
• First circuit |
$90 |
• Each additional circuit |
$12 |
Renewable Electrical Energy |
5 KVA or less (2) |
$144 |
5.01–15 KVA (2) |
$169 |
15.01–25 KVA (2) |
$280 |
Misc. fees |
$85/hr. |
Each additional inspection |
$85 |
Special Fees |
Water/sewer pump |
$109 |
Sign/outline lighting |
$109 |
Signal circuit/limited energy panel, alteration or extension |
$109 |
Minimum permit fee and re-inspection fee |
$85 |
Master permit fee (aka electrical in-plant inspections) |
$85/hour |
Commercial/Industrial Structural Code |
Regular plan review |
65% of building permit fee |
Fire, life, safety review in conjunction with regular plan review |
35% of building permit fee |
Fire, life, safety review independently |
40% of building permit fee |
$1–$500 |
$85 |
$501–$2,000 |
$85 |
$2,001–$25,000 |
$85 + $7.40/$1,000 over $2,000 to $25,000 |
$25,001–$50,000 |
$255.20 + $6.72/$1,000 over $25,000 to $50,000 |
$50,001–$100,000 |
$423.20 + $4.48/$1,000 over $50,001 |
$100,001 + |
$647.20 + $3.75 for each additional $1,000 |
1- and 2-Family Structural
New Construction, Additions, Remodels, Alterations |
Regular plan review |
65% of building permit fee |
$1–$500 |
$85 |
$501–$2,000 |
$85 |
$2,001 - $25,000 |
$85 + $7.40/$1,000 over $2,000 to $25,000 |
$25,001 - $50,000 |
$255.20 + $6.72/$1,000 over $25,000 to $50,000 |
$50,001 to $100,000 |
$423.20 + $4.48/$1,000 over $100,000 |
$100,000 + |
$647.20+$3.75 for each $1,000 |
Research fee |
$70/hour (1 hr minimum) |
Plumbing
Minimum Permit Fee: $85
|
Plumbing plan review is required for new construction and alterations in the following locations per OAR 918-780-0040: Medical gas and vacuum systems in health care facilities; Chemical drain, waste, and vent systems; Sewer waste water pretreatment systems; Vacuum drainage, waste and vent systems; Reclaimed waste water systems; Commercial potable water pressure booster pumps for water supplied by a municipality; Building water service lines with an interior diameter of 2 inches or larger (2 inch water service stamped by professional engineer is exempt); Residential multi-purpose fire sprinkler systems. |
25% - this is a proposed reduction to our current fee structure to make our plan review percentages equal across all permit types (M/P/E) and also to move our plumbing plan review fee in line with industry standards. |
1 & 2 family dwellings |
|
1 bath |
$761 |
2 baths |
$864 |
3 baths |
$956 |
each additional bathroom or half |
$87 |
each additional kitchen |
$87 |
Note: These fees include rainwater disposal system, including leaders & drains to approved disposal area, plumbing fixtures or waste discharging devices, including drain, waste & vent piping, water piping, hot water heaters, the first 100 ft of water service & sanitary sewer line & under floor low point drain. |
Sanitary Sewer |
$145 |
Water closet |
$31 |
Shower bath |
$31 |
Bathtub |
$31 |
Basin, Lav. |
$31 |
Sink, kitchen |
$31 |
Dishwasher |
$31 |
Disposal |
$31 |
Clothes Washer |
$31 |
Water Heater |
$31 |
Laundry Tray or Service Sink |
$31 |
Floor Drains |
$31 |
Bar Sinks |
$31 |
Ice Maker |
$31 |
House moves (not including storm, sanitary sewer or water service inspection |
$91 |
Prefabricated Commercial Structures (not including storm or sanitary sewer, or water service inspection |
$182 |
Hub/Case Drain |
$31 |
Floor sinks |
$31 |
Drinking Fountain |
$31 |
Urinals/Toilets |
$31 |
Water System/First 100 ft. |
$100 |
Water System – additional 100 ft. between 101 ft and 200 ft in length |
$100 |
Water System - Each additional 100 ft. above 200 ft in length |
$25 |
Storm Sewer – First 100 ft or less |
$110 |
Storm Sewer – each add’l 100 ft. |
$74 |
Sanitary Sewer – 150 ft or less total length |
$145 |
Sanitary Sewer – Over 150 ft. total length: |
|
first 50 ft. |
$110 |
each additional |
$74 |
Septic tank conn. – first 50 ft. or less |
$110 |
Septic tank conn. – additional 100 ft. |
$74 |
Roof Drains – (Commercial leader or conductor) |
$19 |
Roof Drain Package – Residential & Duplex |
$182 |
1/2 Roof Drain Package |
$91 |
Trap Primers (1-5) |
$31 |
Trap Primers (over 5, each additional) |
$5 each |
Catch Basins (area drains) |
$31 |
Backflow prevention devices |
$31 |
Interceptors, grease, etc. |
$31 |
Miscellaneous |
$31 |
Drywells/leach line/trench drain |
$31 |
Manufactured home utilities |
$126 |
Manholes |
$31 |
Absorption valves |
$31 |
Backflow preventer |
$31 |
Backwater valve |
$31 |
Ejectors/sump |
$31 |
Expansion tanks (devices) |
$31 |
Fixture/sewer cap |
$31 |
Floor drains/floor sinks/hub |
$31 |
Hose bib |
$31 |
Sump |
$31 |
Hourly rate for any plumbing, electrical, building or manufactured dwelling permit regardless of type |
$85/hr |
Reactivation of any plumbing, electrical, building or manufactured dwelling permit expired up to one year |
50% of New permit fee |
Any permit expired more than one year |
100% of New permit fee |
Plumbing Medical Gas Installation |
$121 plus a fee based on installation costs listed below |
Fees shall be determined based on the value of the medical gas equipment & installation costs |
|
$1 to $5,000 |
$121 |
$5,001 - $10,000 |
$121 + $1.82 each add’l $100 over $5,000 |
$10,001 to $100,000 |
$212 plus $12.34 for each additional $1,000 over $10,000 |
$100,001 and above |
$1,322.60 + $8.47 for each additional $1,000 over $100,000 |
Plan Review |
50% of the installation permit fee |
Residential Fire Suppression Systems |
|
Multi-purpose or continuous loop systems |
0 - 2,000 sq. ft. |
$105 |
2,001 - 3,600 sq. ft. |
$156 |
3,601 – 7,200 sq. ft. |
$198 |
> 7,201 sq. ft (includes Plan Review fee) |
$242 |
Stand Alone Systems |
0 – 2,000 sq. ft |
$198 |
2,001 - 3,600 sq. ft. |
283 |
3,601 - 7,200 sq. ft |
327 |
> 7,201 sq. ft & greater (includes Plan Review fee) |
368 |
Fees for partial installations shall be based on the square footage of the area in which the fire suppression is to be installed. Fees for stand-alone systems do not include required backflow prevention device. A separate fee is required for this installation. |
|
Phased Project Fee |
$250 + 10% of the total project building permit fee. Not to exceed $1,500 for each phase) |
Deferred Submittal |
65% of the permit fee according to OAR 918-0500110 (2)(3) using the value of the particular deferred portion or portions of the project, with a minimum fee of $250. This fee is in addition to the project plan review fee based on the total project value. |