Building Fees

Our fee schedule and tools are meant to assist you in estimating building fees.

Actual building fees vary from project to project. Final project fees may include items we collect on behalf of other agencies, e.g. 12% of all fees collected are returned to the State.

Additionally, projects within the City of Canby use their adopted fee schedule.

We will discuss specific fees with you when you submit your plans or application.

Fee schedules

General Inspections
Inspections outside normal business hours$85/hr + OT (min 4-hr charge)
Re-inspection fees$85
Inspections with no specific fee listed (min. ½ hour)$85/hr
Additional plan review required by change, additions or revisions to approved plans$85/hr (min 1-hr charge)
Residential Certificate of Occupancy (charged when permit is issued)$42.50
Temporary Certificate of Occupancy (commercial)$85/hr (min. 2-hr charge)
Certificate of Occupancy (commercial)$85/hr (min. 2-hr charge)
1- and 2-family mechanical min. permit fee and re-inspection fee$85
For each supplemental permit$21
Heating, Ventilating and Air Conditioning (HVAC)
Air conditioner$18
Alteration of existing HVAC system$18
Fire/smoke dampers/duct smoke detectors$12
Heat pump$18
Install/replace/relocate heaters - suspended, wall or floor-mounted$18
Vent for appliance other than furnace$12
Environmental exhaust and ventilation
Appliance vent$12
Exhaust fan with single duct (bath fans)$9
Dryer exhaust$9
Hoods: Type l/ll residential kitchen/hazmat hood fire suppression systems$12
Exhaust system apart from heating and AC$9
Fuel piping and distribution (up to 4 outlets)$5
Fuel piping (more than 4 outlets, each additional)$2
Fireplaces/Stoves
Decorative fireplace$18
Insert-type$18
Woodstove/pellet stove$18
HVAC Air Handling Unit
0–10K CFM$12
Over 10K CFM$23
Boiler/Compressor
to 3HP/100K BTU$18
to 15hp/500k BTU$33
to 30HP/1.00m BTU$44
to 50HP/1.75m BTU$68
Over 50HP/1.75 BTU$109
Furnace
Up to 100K BTU$18
Over 100K BTU$23
Refrigeration
Absorption unit to 100k BTU$18
Over 100k BTU$23
Chillers/Compressors
Up to 3HP/100K BTU$18
to 15HP/500K BTU$33
to 30HP/1.00m BTU$44
to 50HP/1.75m BTU$68
Over 50HP/1.75 BTU$109
Fuel Piping
0–4 outlets$5
Each additional (4 or more outlets requires a schematic)$2
Process Piping
0–4 outlets$5
Each additional$2
Residential plan review (when applicable)25% of permit fee
Other
Water heater$9
Cook top$12
Gas logs$12
LPG tanks/regulators$12
Mechanical Commercial
($85 min. + fee based on valuation as listed below. Note fees are based on valuation minimum)
$1–$5,000$85
$5,001–$10,000$85 + $1.66 for each $100 of value over $5,000
$10,001–$100,000$168 + $12.34for each $1,000 of value over $10,000
$100,000 +$1,279 + $8.47for each $1,000 of value over $100,000
Commercial plan review25% of base HVAC fee
Manufactured Dwellings, Park Trailers, Cabanas
Site installation/set up fee for manufactured dwelling, park trailer or cabana$407
Earthquake-resistant bracing system installation (in addition to site described above)$103 installation fee
Re-inspection (fee must be paid prior to next inspection)$85/inspection
Installation w/o permitsActual cost of investigation
Inspections outside normal business hours$85/hr (min. 4 hrs OT rate)
OR Mfg. Dwelling Standard publication (required when no installer is involved)$12
Mobile home park construction and recreational park developmentVaries w/ number of spaces
Electrical 
includes a prescribed number of inspections; see electrical permit application for quantities

Electrical plan review required for new construction and alterations in the following locations per OAR 918-311-0040:

  • Service or feeder beginning at 400 amps with available fault current greater than 10,000 amps at 150 volts or less to ground, or any system greater than 14,000 volts
  • Installation of 150 KVA or larger separately derived system per Article 100 of the NEC
  • Addition of a new motor load greater than 100 HP
  • Fire pump installations as defined in Article 695 of the NEC
  • Emergency systems installations as defined in Article 700 of the NEC
  • Six or more residential units in one structure or any A, E, 1-2 or
    1-3 occupancies as defined in the Oregon Structural Specialty Code 25% of permit fee
  • Service or feeder rated at 60 amps or over
  • System over 600 supply volts nominal
  • Building more than 3 stories in height
  • Building over 10,000 sq. ft.
  • Occupant load over 99 persons
  • Manufactured structures park or recreational vehicle park; new addition or alterations
  • Classified area or structure containing special occupancy as described in NEC Chapter 5

 

Residential single- or multi-family dwelling units including attached garages and covered areas not more than 1,000 sq. ft.$270
Each additional 500 sq. ft.$55
Limited energy: up to 2 inspections only$109
Limited energy, residential$109
Limited energy, multi-family$109
Note: This fee covers all limited energy systems in residential occupancies when installed at the same time by the permittee. Installations such as antenna wire, computer wire and alarm wire done by other contractors require separate permits and fees. No limited energy permit is required if the original permittee installs wire for doorbells, garage door openers, and heating and air conditioning controls.
Manufactured home service or feeder$109
Temp. Const. Service, Feeder
Less than 200 amps$94
201–400 amps$200
401–600 amps$270
601–1000 amps$482
Over 1000 amps$882
Permanent Service, Feeder
Less than 200 amps$161
201–400 amps$213
401–600 amps$321
601–1000 amps$482
>1000 amps$882
Service reconnect only$109
Branch Circuits
new, alteration, extension per panel
With purchase service or feeder$12
Without purchase service or feeder: 
• First circuit$90
• Each additional circuit$12
Renewable Electrical Energy
5 KVA or less (2)$144
5.01–15 KVA (2)$169
15.01–25 KVA (2)$280
Misc. fees$85/hr.
Each additional inspection$85
Special Fees
Water/sewer pump$109
Sign/outline lighting$109
Signal circuit/limited energy panel, alteration or extension$109
Minimum permit fee and re-inspection fee$85
Master permit fee (aka electrical in-plant inspections)$85/hour
Commercial/Industrial Structural Code
Regular plan review65% of building permit fee
Fire, life, safety review in conjunction with regular plan review35% of building permit fee
Fire, life, safety review independently40% of building permit fee
$1–$500$85
$501–$2,000$85
$2,001–$25,000$85 + $7.40/$1,000 over $2,000 to $25,000
$25,001–$50,000$255.20 + $6.72/$1,000 over $25,000 to $50,000
$50,001–$100,000$423.20 + $4.48/$1,000 over $50,001
$100,001 +$647.20 + $3.75 for each additional $1,000
1- and 2-Family Structural
New Construction, Additions, Remodels, Alterations
Regular plan review65% of building permit fee
$1–$500$85
$501–$2,000$85
$2,001 - $25,000$85 + $7.40/$1,000 over $2,000 to $25,000
$25,001 - $50,000$255.20 + $6.72/$1,000 over $25,000 to $50,000
$50,001 to $100,000$423.20 + $4.48/$1,000 over $100,000
$100,000 +$647.20+$3.75 for each $1,000
Research fee$70/hour (1 hr minimum)

Plumbing

Minimum Permit Fee: $85

Plumbing plan review is required for new construction and alterations in the following locations per OAR 918-780-0040: Medical gas and vacuum systems in health care facilities; Chemical drain, waste, and vent systems; Sewer waste water pretreatment systems; Vacuum drainage, waste and vent systems; Reclaimed waste water systems; Commercial potable water pressure booster pumps for water supplied by a municipality; Building water service lines with an interior diameter of 2 inches or larger (2 inch water service stamped by professional engineer is exempt); Residential multi-purpose fire sprinkler systems.25% - this is a proposed reduction to our current fee structure to make our plan review percentages equal across all permit types (M/P/E) and also to move our plumbing plan review fee in line with industry standards.
1 & 2 family dwellings 
   1 bath$761
   2 baths$864
   3 baths$956
   each additional bathroom or half$87
   each additional kitchen$87
Note: These fees include rainwater disposal system, including leaders & drains to approved disposal area, plumbing fixtures or waste discharging devices, including drain, waste & vent piping, water piping, hot water heaters, the first 100 ft of water service & sanitary sewer line & under floor low point drain.
Sanitary Sewer$145
Water closet$31
Shower bath$31
Bathtub$31
Basin, Lav.$31
Sink, kitchen$31
Dishwasher$31
Disposal$31
Clothes Washer$31
Water Heater$31
Laundry Tray or Service Sink$31
Floor Drains$31
Bar Sinks$31
Ice Maker$31
House moves (not including storm, sanitary sewer or water service inspection$91
Prefabricated Commercial Structures (not including storm or sanitary sewer, or water service inspection$182
Hub/Case Drain$31
Floor sinks$31
Drinking Fountain$31
Urinals/Toilets$31
Water System/First 100 ft.$100
Water System – additional 100 ft. between 101 ft and 200 ft in length$100
Water System - Each additional 100 ft. above 200 ft in length$25
Storm Sewer – First 100 ft or less$110
Storm Sewer – each add’l 100 ft.$74
Sanitary Sewer – 150 ft or less total length$145
Sanitary Sewer – Over 150 ft. total length: 
   first 50 ft.$110
   each additional$74
Septic tank conn. – first 50 ft. or less$110
Septic tank conn. – additional 100 ft.$74
Roof Drains – (Commercial leader or conductor)$19
Roof Drain Package – Residential & Duplex$182
1/2 Roof Drain Package$91
Trap Primers (1-5)$31
Trap Primers (over 5, each additional)$5 each
Catch Basins (area drains)$31
Backflow prevention devices$31
Interceptors, grease, etc.$31
Miscellaneous$31
Drywells/leach line/trench drain$31
Manufactured home utilities$126
Manholes$31
Absorption valves$31
Backflow preventer$31
Backwater valve$31
Ejectors/sump$31
Expansion tanks (devices)$31
Fixture/sewer cap$31
Floor drains/floor sinks/hub$31
Hose bib$31
Sump$31
Hourly rate for any plumbing, electrical, building or manufactured dwelling permit regardless of type$85/hr
Reactivation of any plumbing, electrical, building or manufactured dwelling permit expired up to one year50% of New permit fee
Any permit expired more than one year100% of New permit fee
Plumbing Medical Gas Installation$121 plus a fee based on installation costs listed below
Fees shall be determined based on the value of the medical gas equipment & installation costs 
$1 to $5,000$121
$5,001 - $10,000$121 + $1.82 each add’l $100 over $5,000
$10,001 to $100,000$212 plus $12.34 for each additional $1,000 over $10,000
$100,001 and above$1,322.60 + $8.47 for each additional $1,000 over $100,000
Plan Review50% of the installation permit fee
Residential Fire Suppression Systems 
Multi-purpose or continuous loop systems
   0 - 2,000 sq. ft.$105
   2,001 - 3,600 sq. ft.$156
   3,601 – 7,200 sq. ft.$198
   > 7,201 sq. ft (includes Plan Review fee)$242
Stand Alone Systems
   0 – 2,000 sq. ft$198
   2,001 - 3,600 sq. ft.283
   3,601 - 7,200 sq. ft327
   > 7,201 sq. ft & greater (includes Plan Review fee)368
Fees for partial installations shall be based on the square footage of the area in which the fire suppression is to be installed. Fees for stand-alone systems do not include required backflow prevention device. A separate fee is required for this installation. 
Phased Project Fee$250 + 10% of the total project building permit fee. Not to exceed $1,500 for each phase)
Deferred Submittal65% of the permit fee according to OAR 918-0500110 (2)(3) using the value of the particular deferred portion or portions of the project, with a minimum fee of $250. This fee is in addition to the project plan review fee based on the total project value.

Phone:503-742-4240
Fax:503-742-4741
Email:bldservice@clackamas.us

150 Beavercreek Road Oregon City, OR 97045

Office Hours:

Monday to Thursday 
8 a.m. to 4 p.m.